Montague Road

The project involved a series of tasks and procedures that were executed to ensure its successful completion. These works were carefully planned and implemented in a systematic manner to achieve the desired outcome by:

  • Demolishing the existing structures in the building
  • Excavating the relevant area as per drawings
  • Double height underpinning basement to the existing house
  • Secant pilling to rear basement extension
  • Groundworks for the entire basement
View the Gallery

Stanhope Gardens

The project involved a series of tasks and procedures that were executed to ensure its successful completion. The works were planned and implemented in a systematic manner to achieve the desired outcome by:

  • Completing groundwork to create a stable and level surface
  • Installed fencing for security and privacy
  • Constructed garden steps for easy access to different levels
  • Erected a gabion wall
  • Conducted tilling to prepare the soil for planting and enhance the garden's appearance
  • Surveyed to ensure the garden was correctly laid out
  • Completed some excavating to prepare for installation of garden features
  • Progressed towards creating a functional and visually appealing garden space
View the Gallery

Old Roar Road

The Old Roar Road project in Hastings, managed by Malci Construction, involved comprehensive groundworks for a two-level villa. This intricate project encompassed several critical stages to ensure the structural integrity and functionality of the development:

  • The project commenced with the installation of 12 meticulously planned piles, providing a robust foundation based on precise engineering drawings.
  • Following piling, the team expertly lowered ground levels and conducted blinding to prepare for subsequent structural enhancements.
  • The project included reinforcing and casting a lower-level slab that served as the base for constructing durable retaining walls, which were filled with concrete and allowed to cure properly.
  • Installation of pre-cast hollow core planks was carried out to support the upper levels, alongside the integration of an efficient first-floor foul drainage system.
  • The final phase involved additional reinforcement and concrete casting to complete the structure, adhering to the highest standards of construction and engineering.
  • To manage stormwater effectively, an attenuation tank was installed, ensuring compliance with environmental regulations and reducing the impact on local drainage systems.
View the Gallery

808-812 High Rd Tottenham

The Tottenham project, a showcase of engineering precision and strategic planning, is advancing despite challenging environmental conditions. This project involves the intricate development of a basement that demands both functional and safety-oriented solutions. The project's scope includes managing complex dewatering processes to lower the water table, constructing reinforced concrete retaining walls, and meticulous underpinning below the water table. The successful progression of this project is achieved through:

  • Diligent management of dewatering efforts to effectively lower and control the water table, a critical and ongoing challenge.
  • Construction of reinforced concrete retaining walls that are integral to the structural stability and safety of the entire development.
  • Implementation of underpinning operations below the water table, designed to address the challenges posed by fluctuating water levels and adverse weather conditions.
  • Piling works for robust foundation support under a Grade II listed building, ensuring preservation and structural integrity.
  • Development of a new basement, where meticulous planning and execution are crucial due to the historical significance and preservation requirements of the building.
View the Gallery

Hampton Hill

The project involved a series of tasks and procedures that were executed to ensure its successful completion. The works were planned and implemented in a systematic manner to achieve the desired outcome by:

  • Clearing and preparing the site by removing waste materials and debris
  • Levelling the ground using excavators to ensure a proper foundation
  • Laying rebars and mesh to reinforce the foundation and installing necessary pipework
  • Pouring the concrete for the foundation and floor
  • Constructing the formwork for the building using steel columns and beams
  • Connecting the formwork to existing walls using the correct lifting equipment
View the Gallery

Underriver House

The Underriver project, a collaboration with Westgreen, involved meticulous construction and engineering feats to create a multifaceted facility that blends functionality with artistic design. The project scope included the construction of an orangery with precision steelwork, the underpinning of a basement to enhance structural integrity, and the establishment of robust foundations for key amenities including an air source heat pump, an art gallery, and a gym. The successful execution of this project was achieved through:

  • Precise steelwork construction to ensure durability and aesthetic appeal for the orangery and gym.
  • Strategic underpinning of the basement to provide a strong foundation for the entire structure
  • Installation of foundational elements for the air source heat pump, promoting energy efficiency and sustainability.
  • Executed foundational and reinforcement work for the art gallery and gym, ensuring structural stability and compliance with safety regulations while maintaining aesthetic appeal.
View the Gallery

53-54 Glebe Place

The project at 53-54 Glebe Place involved a series of systematic tasks for the successful completion of a complex structural refurbishment, executed as follows:

  • Installation of necessary temporary works to maintain structural integrity.
  • Managed full project planning and execution with complete autonomy, applying expertise in temporary works and steel refurbishment.
  • Ensured efficient workflow and adherence to the project timeline.
  • Maintained the highest industry safety standards throughout the project.
  • Delivered a safe and structurally sound building.
View the Gallery

Frognal Lane

The project involved a series of tasks and procedures that were executed to ensure its successful completion. The works were planned and implemented in a systematic manner to achieve the desired outcome by:

  • Sub-basement piling: Installing deep foundation elements below the basement level for stability
  • Excavation for basement: Digging out the area where the basement will be located
  • Constructed basement: Building the walls, floors, and ceilings of the basement
  • Completed Ground, first, and second floor columns and slabs: Installing structural elements to support above-ground floors
  • Lift shaft made using shutters: Constructing the lift shaft using temporary molds and pouring concrete
View the Gallery
Malci Construction Logo

Our Location

Malci Construction
1 Courtyard Studios
32 High Street
Northwood
HA6 1BN

Find Us

Find Us On

© Copyright 2025 Malci ConstructionsWeb Design By Toolkit Websites