Canonbury Park Road

Project: Shell & Core. Underpinning, temporary works, mass excavation, RC lining walls


Client: Harris Calnan


Duration: 26 weeks

Malci were employed to construct new basement to an existing building, demolition of section at rear and construct new RC ground floor and lining walls.

This project was a challenge as all the basement works were carried out on the boundary of the water table where Malci had to manage the water ingress whilst doing the ground works.

Malci had to construct two RC sump pump chambers through the water table where temporary works had to be carried out by Malci with assistance of their temporary works engineer.

© Copyright 2020 Malci ConstructionsWeb Design By Toolkit Websites